Frame assembly – Therma-Tru Smooth-Star User Manual

Page 4

Advertising
background image

3

NOTE:
A large work area is needed to assemble the frame kit. Cover area with
cardboard from one or more door panel cartons to protect frame parts
and floor.

Lay parts on floor and position sill, head,
and side jambs with exterior side up.

Side Jamb

Sill

Head Jamb

Side Jamb

Exterior

Frame Assembly

Engage groove in sill cap base with sill.

Rotate sill cap base down to snap into place.
Use a rubber mallet if necessary.

For units using the wide profile top-hung screens, install top-hung screen track and
adapter into head jamb prior to assembly.

Reference steps 1 thru 4 of the “Wide Profile” Screen Installation - Sliding Patio
instructions, included with the top-hung screen, for complete details.

LAY FRAME COMPONENTS ONTO WORK AREA

INSTALL SILL CAP BASE

IF APPLICABLE, INSTALL TOP-HUNG SCREEN

TRACK

1

3

2

Sill cap base

Advertising
This manual is related to the following products: