Top Innovations SF-432 User Manual

Page 8

Advertising
background image

8

Top Innovations, Inc.

A

SSEMBLING THE

F

ABRIC

S

TEAMER

& I

RON

FIGURE 2

MOUNTING BASE UNIT ONTO WALL-MOUNTING BASE

1. Hang Steam Nozzle securely onto Steam Nozzle Hanger (FIGURE 2-A).

2. Align two holes on back of Water Reservoir with two hooks protruding from front of

Wall-Mounting Base. Press Water Reservoir onto Wall-Mounting Base. Once pressed
together, slide Water Reservoir down to secure it onto Wall-Mounting Base
(FIGURE 2-B).

NOTE: To keep the power cord stored away when not in use, cord may be wrapped
around the Water Reservoir while Base Unit is mounted on the Wall-Mounting Base.

Top Innovations, Inc.

A

SSEMBLING THE

F

ABRIC

S

TEAMER

& I

RON

9

FIGURE 3

CONNECTING THE FABRIC BRUSH

CAUTION: Use care when connecting Fabric Brush, as Ironing Plate may be hot.
Do not attempt to connect Fabric Brush while unit is emitting steam.

1. Slide Fabric Brush onto Steam Nozzle, over Ironing

Plate as shown (FIGURE 3). Press down until
hook on bottom of Brush (FIGURE 3-A) catches
onto tab below Plate (FIGURE 3-B). Fabric Brush
should now be secured in place.

2. In order to remove Fabric Brush, pull outward on

hook until it slides upward over tab. Pull upward
on Brush to slide it over Ironing Plate and off of
Steam Nozzle.

A

B

A

B

Advertising