1 unpacking – TANDBERG Management Server D13939 User Manual

Page 11

Advertising
background image

Quick Setup Guide

Introduction

11

2.1 Unpacking


To avoid damage to the unit during transportation, the Management Server is delivered in a special
shipping box, which should contain the following components:

ƒ User Manual and other documentation on CD.
ƒ Rack-ears, screws and screwdriver.
ƒ Cables:

o

Power

cable

o

Ethernet

cable

ƒ TANDBERG

Management

Server

Installation site preparations

ƒ Make sure that the Management Server is accessible and that all cables can be easily connected.
ƒ For ventilation: Leave a space of at least 10cm (4 inches) behind the Management Server’s rear

panel and 10cm (4 inches) in front of the front panel.

ƒ The room in which you install the Management Server should have an ambient temperature

between 0

º

C and 35

º

C (32

º

F and 95

º

F) and between 10% and 90% non-condensing relative

humidity.

ƒ Do not place heavy objects directly on top of the Management Server.
ƒ Do not place hot objects directly on top, or directly beneath the Management Server.
ƒ Use a grounded AC power outlet for the Management Server.

Rack Mounting (optional)

The Management Server comes with rubber feet for standalone installation and brackets for mounting in
standard 19” racks.

Before starting the rack mounting please make sure the TANDBERG Management Server is placed
securely on a hard flat surface.

1. Disconnect the AC power cable.
2. Make sure that the mounting space is prepared according to the ‘Installation site preparations’

above.

3. Attach the brackets to the Management Server on both sides of the unit.
4. Insert the Management Server into a 19” rack, and secure with screws in the front (four screws).

Advertising