Preparation, 1 – frame assembly, 48/42u – Tripp Lite SREXTENDER User Manual

Page 2: Parts list

Advertising
background image

2

F

G

A

B

C

D

E

H

N

O

P

K

L

M

I

J

A

B

C

D

48/42U

1-1

Preparation

(continued)

Note: The hinge swivels

H

and 12 hinge swivel screws

L

are pre-installed in the vertical sections

A

through

D

.

Parts List

(If any parts are missing, contact Tripp Lite.)

A

Lower Left Vertical Section (1)

B

Lower Right Vertical Section (1)

C

Upper Left Vertical Section (1)

D

Upper Right Vertical Section (1)

E

Top Section (1)

F

Bottom Section (1)

G

1U Blanking Panels (3)

H

Hinge Swivels (6 - all pre-installed)

I

Hinges (4)

J

Cable Manager Brackets (2)

K

M6 x 12 mm Flat-Head Screws (8)

L

M6 x 12 mm Pan-Head Screws

and Washers (14 total - 12 pre-installed)

M

M5 x 10 mm Pan-Head Screws

and Washers (40)

N

Grounding Cable (1)

O

M5 x 20 mm Pan-Head Screws and

Washers (4)

P

M4 x 8 mm Pan-Head Screws

and Washers (8)

1 – Frame Assembly

Note: For 25U enclosures, you will use only the lower vertical sections

A

and

B

. You will not use the upper vertical sections

C

and

D

.

For 48U and 42U enclosures, you will use all four vertical sections.

(For 25U enclosures, skip this step.) Slide the lower left vertical
section

A

inside the upper left vertical section

C

as shown.

Repeat for the lower right vertical section

B

and the upper right

vertical section

D

. The vertical sections are not interchangeable,

so refer to the diagram to confirm that you’re assembling the
correct sections.

1-1

Advertising