PAGE 10

CONNECTING GAS SERVICE

Connect gas service meter to control assembly in accordance with the latest revision of

ANSI Z223.1 and local codes or utility. A ground joint union should be installed for easy

removal of gas control for servicing. A drip or trap must be installed at the bottom of a vertical

section of piping at the inlet to the gas valve. A pipe compound resistant to the action of

liquefied petroleum gases must be used on all threaded pipe connections. Check with the

local utility for location of manual shutoff valve if required. See figure 10 below.

1. The gas line should be of adequate size to prevent undue pressure drop and never

smaller than the pipe size of the main gas control valve.

2. The boiler and its gas connection must be leak tested before placing the boiler in

operation. To check for leaks in gas piping, use a soap and water solution or other approved
method.

WARNING:

DO NOT USE

AN OPEN FLAME.

3. The boiler and its individual shutoff

valve must be disconnected from the gas
supply piping system during any pressure
testing of that system at test pressures in
excess of 1/2 psi (3.5 kPa). The boiler must
be isolated from the gas supply piping system
by closing its individual manual shutoff valve
during any pressure testing of the gas supply
piping system at test pressures equal to or
less than 1/2 psig (3.5 kPa).

ELECTRICAL WIRING

SEE ADDENDUM "A" FOR WIRING DIAGRAMS AND COMPONENT CODING

Electrical wiring must conform with the latest revision of the National Electrical Code, ANSI/

NFPA No. 70 and/or local authority having jurisdiction.

WARNING:

1. The boiler, when installed, MUST BE electrically grounded

in accordance with these requirements.

2. Install a fused disconnect switch between boiler and meter at a convenient location.