DRAIN INSTALLATION

PLEASE READ all instructions completely before attempting
to install or operate the unit. All Ice Makers require a con-
nection to the water supply and improper hook-up can
result in substantial property damage! All water and drain
connections MUST BE made by a licensed/qualified plumb-
ing contractor. Failure to follow recommendations and
instructions may result in damage and/or harm.

Plumbing installation must observe all state and local
codes. All water and drain connections MUST BE made by
a licensed/qualified plumbing contractor. Failure to follow
recommendations and instructions may result in damage
and/or harm.

The CLR60 can be installed using a gravity drain or can use a factory
installed or equivalent drain pump.

Follow these guidelines when installing drain lines to prevent water from
flowing back into the ice maker storage bin and/or potentially flowing
onto the floor causing water damage:

Gravity Drain

• Drain lines must have a 5/8 inch inside diameter.

• Drain lines must have a 1 inch drop per 48 inches of run (1/4 inch

per foot) and must not create traps.

• The floor drain must be large enough to accommodate drainage

from all drains.

• Insulate the bin drain line to prevent condensation.

CLR60 With Factory Installed Drain Pump

NOTE

Before installing your U-Line CLR60 With Factory Installed
Pump, it is extremely important to check and test all hose
connections at the drain pump There is a possibility that
hose connections may have loosened during shipment.

!

CAUTION

Advertising