Owner’s manual, Pre-installation preparation, General venting – Vanguard Managed Solutions MBDV37 User Manual

Page 5: Continued, Location of vent termination

Advertising
background image

5

106497

OWNER’S MANUAL

C

B

A

D

E

F

G

Top of Louver Opening

3

2

1

4

5

6

7

Wall

29"

13"

10

1

/

4

"

8

3

/

4

"

37"
41"

37

1

/

2

"

41

1

/

2

"

58"

9

1

/

4

"

41"

Note: Where two numbers are given the top number

is exclusive to the 37" Fireplace and the bottom
number is exclusive to the 41" Fireplace

Nailing Tabs

PRE-INSTALLATION
PREPARATION

Continued

Figure 6 - Framing Clearances for Corner Installation

LOCATION OF VENT
TERMINATION

When locating vent termination, it is impor-
tant to observe the minimum clearances
shown in Figure 8, page 6. You will avoid
extra framing by positioning your fireplace
against an already existing framing mem-
ber. The sides of the fireplace may be posi-
tioned directly against combustible walls.

*Check with local codes or with the current
CAN/CGA B149[.1 or .2] Installation Codes
for Canada or the USA Installations follow
the current National Fuel Gas Code, ANS
Z223.1
, also known as NFPA 54.

Note:

Terminations are not designed for

installation prior to transportation.

These models are approved for use with
Simpson Dura-Vent 6

5

/

8

" direct-vent pipe

components and terminations as well as both
flex and rigid Vanguard vent components.

Your fireplace is approved to be vented either
through the side wall, or vertically using the
following guidelines:

• Only use Vanguard or Simpson Dura-

Vent GS venting components or kits spe-
cifically approved for this fireplace.

• Minimum clearance between vent pipes

and combustible materials is 1" (25 mm),
except where stated otherwise.

• Combustible material may be flush with

the top front of fireplace with a maxi-
mum thickness of 3/4".

• Do not recess venting terminals into a

wall or siding.

• Install horizontal venting with a 1/4" rise for

every 12" of run toward the termination.

• You may paint the vent terminal with

450ºF (232ºC) heat-resistant paint to co-
ordinate with the exterior finish.

• There must not be any obstruction such

as bushes, garden sheds, fences, decks,
or utility buildings within 24" from the
front of the termination cap.

• Do not locate termination cap where exces-

sive snow or ice build up may occur. Be sure
to clear vent termination area after snow falls
to prevent accidental blockage of venting
system. When using snow blowers, do not
direct snow towards vent termination area.

GENERAL VENTING

Figure 7 - Clearances for Combustible Mantels

Ref.

Mantel Depth

Ref. Mantel from Top

of Louver Opening

1

14" (356mm)

A

16" (406mm)

2

12" (305mm)

B

14" (356mm)

3

10" (254mm)

C

12" (305mm)

4

8" (203mm)

D

10" (254mm)

5

6" (152mm)

E

8" (203mm)

6

4" (101mm)

F

6" (152mm)

7

2" (51mm)

G

4" (101mm)

Note: There must be a
minimum clearance of
18" above top of louver
opening when installing a
television or entertain-
ment center above the
fireplace.

Continued

Advertising
This manual is related to the following products: