Georgian bay 36”/41 – Vermont Castings ESSENTIA NV-E6DMS-DC User Manual

Page 3

Advertising
background image

3

30003743

6. Place the top dome section onto the main body sec-

tion by lifting the top dome section over the top edge
of the main body section. You will notice on the back
side of the top dome section two slotted grooves
in the sheet metal. These grooves align with the
flanged brackets on top of the main body section.
Gently slide the top dome section into place and
allow the flanged brackets to slip into the grooves on
the back side of the top dome section. (Fig. 7)

7. Install the two extension knobs supplied onto the gas

valve appropriate knobs.

8. Installation is complete.

�����
���������������
�����

Top Dome Section

Slotted Groove

Main

Body

Section

Flanged

Bracket

KT700

Slotted

Groove

Flanged

Bracket

Fig. 7 Lift and slide top dome section over top edge of main
body section and onto brackets.

1

2

3

4

5

6

7

8

9

9

10

10

11

12

14

15

17

17

18

18

19

22

25

28

27

16

20

20

����
������������������������
����

CFM Corporation reserves the right to make changes in design, materials, specifications, prices and discontinue colors and products at any time,
without notice.

Georgian Bay 36”/41”

Advertising