CHECKING GAS
CONNECTIONS

Pressure Testing Gas Supply
Piping System

Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)

1.

Disconnect appliance with its appliance
main gas valve (control valve) and equip-
ment shutoff valve from gas supply pip-
ing system. Pressures in excess of 1/2 psig
will damage heater regulator.

2.

Cap off open end of gas pipe where
equipment shutoff valve was connected.

3.

Pressurize supply piping system by ei-
ther using compressed air or opening
main gas valve located on or near gas
meter.

4.

Check all joints of gas supply piping
system. Apply mixture of liquid soap
and water to gas joints. Bubbles form-
ing show a leak.

5.

Correct all leaks at once.

6.

Reconnect heater and equipment
shutoff valve to gas supply. Check re-
connected fittings for leaks.

WARNING: Never use an open

flame to check for a leak. Apply a
mixture of liquid soap and water
to all joints. Bubbles forming
show a leak. Correct all leaks at
once.

WARNING: Test all gas pip-

ing and connections for leaks
after installing or servicing. Cor-
rect all leaks at once.

Figure 14 - Equipment Shutoff Valve

Equipment
Shutoff
Valve

Open

Closed

Figure 15 - Checking Gas Joints

Gas Meter

Control Valve Location

Test Pressures Equal To or Less Than 1/2
PSIG (3.5 kPa)

1.

Close equipment shutoff valve (see Fig-
ure 14).

2.

Pressurize supply piping system by ei-
ther using compressed air or opening
main gas valve located on or near gas
meter.

3.

Check all joints from gas meter to
equipment shutoff valve (see Figure
15). Apply mixture of liquid soap and
water to gas joints. Bubbles forming
show a leak.

4.

Correct all leaks at once.

Pressure Testing Heater Gas
Connections

1.

Open equipment shutoff valve (see Fig-
ure 14).

2.

Open main gas valve located on or near
gas meter.

3.

Make sure control knob of heater is in
the OFF position.

4.

Check all joints from equipment shutoff
valve to control valve (see Figure 15).
Apply mixture of liquid soap and wa-
ter to gas joints. Bubbles forming show
a leak.

5.

Correct all leaks at once.

6.

Light heater (see Operating Heater,
pages 12 and 13). Check the rest of the
internal joints for leaks.

7.

Turn off heater (see To Turn Off Gas to
Appliance
, page 13).

8.

Replace front panel.