Mower deck installation (pto shaft connection), Deck counterweight spring installation, Assembly instructions – Walker MDD (20.9 HP) User Manual

Page 25

Advertising
background image

Assembly Instructions

21

6. Raise the front mower body (instead of lifting

the front of deck) and clip the counterweight
springs to the receptacle on front of body.
Lower the front body to tension the springs.
(Refer to Deck Counterweight Spring Instal-
lation
photo.)

Mower Deck Installation (PTO Shaft Connection)

7. With the counterweight springs connected, the

weight on the deck caster wheels should be
15 to 25 Ib (7 to 11 kg). Check this weight by lift-
ing on the front of the deck carrier frame. If
required, the spring tension can be adjusted by
tightening or loosening the elastic stop nuts
located underneath the lower spring hook.
Refer to Deck Counterweight Spring Installa-
tion
photo.

Deck Counterweight Spring Installation

PTO Connection

Grease Deck

Support Arms

Arrows on Shaft and Tube

(used to align when sliding together)

Hitch Pins

Lock Deck On

Support Arms

Spring Tension Adjustment

Nut Located Under Lower

Spring Hook (Not Visible)

Counterweight Springs Clip

Onto Body With Forward

Body Tilted Up

Advertising