Installation – mounting the hood – Zephyr ZNA-M90S User Manual

Page 11

Advertising
background image

9

Add Blockings

Fasten Support Frame

Install Duct Cover

Fasten upper duct cover

Adjust height & fasten frame

1. Add and secure blocking (minimum 2x4
studs onto ceiling joists.
2. Fasten mounting telescopic support frame
directly onto ceiling joist or stud blockings.
3. Adjust height requirement and fasten
support frames together. NOTE: If
recirculating the hood, install air diverter
plate onto support frame.
4. Slide upper and lower telescopic duct
duct covers onto support frame. Fasten
upper duct cover piece to frame.
5. Install duct work and electrical

CAUTION: At least two installers are

required due to the weight and size of the
hood.

!

Installation –

Mounting the Hood

Advertising
This manual is related to the following products: