Installation – preparing electrical and ducting – Zephyr AK11005 User Manual

Page 12

Advertising
background image

1. Remove filters

2. Remove cover from junction box to
gain access to electrical wiring.

3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.

4. If using hood in air recirculating
mode skip steps 4 and 5.

Pry open desired 3-1/4” x 10” ducting
knock-out either on top or back of
hood.

5. Secure 3-1/4” x 10” starting collar
with damper to the duct opening using
(10) M4x8 screws.

Installation –

Preparing Electrical and Ducting

10

www.zephyronline.com

Advertising
This manual is related to the following products: