Installation – mounting the range hood, Push in on panel latch then pull panel down – Zephyr AK11005 User Manual

Page 15

Advertising
background image

Installation –

Mounting the Range Hood

13

Hood is designed for installation under a kitchen

cabinet (Fig 1)

1. Select preferred duct location (vertical or horizontal) if

ducting out of kitchen. Refer to page 7 for details.

2. Begin installation by removing the fi lters (if installed)

and side spacer panels (36” models only). (Fig 2)

3. Reinforce cabinet with 1”x2” wood strips if additional

strengthening is required or if cabinets are framed.

4. Temporarily position the range hood in the desired

mounting location. Measure and mark the mounting
holes, duct and electrical locations with a pencil.

5. Drill/cut out the required openings for duct and

electrical access by following the dimensions on page
8; make sure the duct opening is large enough to apply
duct tape.

6. Fasten hood onto cabinet with (4) M4 wood screws

with washers provided.

7. Install

electrical.

8. Install duct work and seal with duct tape.

9. Reinstall fi lters and side spacer panels (if applicable).

10. Power up hood and check for leaks around duct tape.

11. If recirculating the hood refer to page 11 and 12 for

details.

duct/silver
tape

Duct
opening
cutout

Add 1x2

wood strips

electrical

Fig 1

(Shown as vertical ducting)

Push in on panel latch then pull panel down

Fig 2

Advertising
This manual is related to the following products: