Set up – Zenoah BT225 User Manual

Page 12

Advertising
background image

12

MOUNTING ENGINE (SE1)
1. Loosen the bolts temporarily attached to the

clutch housing.

2. Push the driveshaft toward the gearcase and

rotate it by hand to check that the driveshaft is
engaged with the gears.

3. Insert the shaft tube into the clutch housing until

it bottoms. When difficult to engage, twist the
engine slightly.

4. Align the positioning holes on the clutch housing

and the shaft tube and fit the bolt into the holes.
And fasten the tightning bolts by turns securely.

(Tightning torque: 4.9~7.8 N.m. (0.5~0.8kg·m))

(1) Positioning hole
(2) Bolt (M5x10)
(3) Tightning bolt (M5x22)

INSTALLING HANDLE (SE2)
• Mount the handle to the shaft tube and clamp it

at your best operating position.

INSTALLING DEBRIS GUARD (SE3)
• Put the debris guard on the shaft tube near the

gear box, attach it with the screw and nut
provided.

CONNECTING THROTTLE WIRE
1. Remove the air cleaner cover. (SE4)

2. Connect the end of the throttle wire to the joint

on the top of the carburetor. (SE5)

CONNECTING SWITCH WIRES
• Connect the switch wires between the engine

and the main unit. Pair the wires of the same
color.

6. Set up

SE1

SE2

SE3

SE4

SE5

Advertising