3M 2475 User Manual

Page 9

Advertising
background image

Performance Series

Component Placement

5

Call Stations

For proper system operation, install the Call Stations in locations:

1. Chosen for ease of use.

2. At least 48 inches above the pavement.

Note

Local codes may dictate placement of call stations.

Figure 5. Suggested Call Station Placement

Station Selectors

For proper system operation, locate the Station Selectors:

1. At locations chosen for maximum efficiency.

2. On counters, mounted on pedestals, or mounted on walls.

3. In dry and heated areas.

Figure 6. Suggested Station Selector Station Placement

Advertising
This manual is related to the following products: