Installation installation – STIEBEL ELTRON HDB-E Si с 01.02.2013 User Manual

Page 23

Advertising
background image

En

gl

ish

www.stiebel-eltron.com

HDB-E Si |

23

InStallatIOn

Installation

26

�02

�02

�1

10

1

f

f Press the two locking hooks and remove the lower part of

the back panel towards the front.

26

�0

2�

02

�0

81

0�

f

f Mark out the holes to be drilled; see chapter “Specification /

Dimensions and connections”.

f

f Drill the holes and secure the mounting bracket with

2 screws and 2 rawl plugs (screws and rawl plugs are not

part of the standard delivery).

Note

If you are installing the appliance with flexible water con-

nections. secure the back panel with a screw.

f

f Fit the mounting bracket.

160

≥ 30

26

�0

2�

02

�0

88

7

f

f Prepare the power cable.

making the water connection

!

Material damage

Carry out all water connection and installation work in

accordance with regulations.

26

�0

2�

02

�0

79

8

f

f Seal and insert the twin nipples.

1

2

26

�0

2�

02

�0

79

9

1 DHW tee

2 Cross-piece

f

f Secure the tee and cross-piece, with a flat gasket each, to the

twin nipples.

Fitting the strainer

!

Material damage

The strainer must be fitted for the appliance to function.

f

f When replacing the appliance. check that the strain-

er is present.

26

�0

2�

02

�0

85

6

f

f Fit the strainer provided in the cold water inlet of the

appliance.

installing the dmB flow limiter

26

�0

2�

02

�0

85

7

f

f Install the flow limiter provided in the cold water inlet of the

appliance.

Advertising