Installation – American Magnetics 05200PS-430-601 High Stability Integrated Power Supply System User Manual

Page 39

Advertising
background image

Rev. 3

21

Installation

Power-Up Procedure

properly make a few connections between the various system

components which were disconnected to facilitate packing and

shipping.

2. Temporarily place a short across the magnet current terminals.

Often this is most easily accomplished by unfastening the heavy

cables from the magnet current leads and fastening them together.

1

This will allow rudimentary power supply checks without

energizing the superconducting magnet.

3. Energize the Model 430 Programmer by placing the power switch

in the

I (ON) position.

Note

Ensure the Model 601 energy absorber power adapters are properly

connected to the energy absorbers and their respective AC power

receptacles.

4. When prompted by the Model 430 Programmer, energize the power

supply and press ENTER on the Model 430 Programmer.

The slave unit must be turned on between 2 to 5 seconds after the

master, otherwise the units will fault and the power-up for all units

will have to be repeated.

Note

Remember to adjust the programmer voltage limit settings as

necessary to account for the additional voltage (5 V) required to

operate the system with a Model 601 installed.

Warning

All power supply parameters, both hardware and software, have

been set at the AMI factory. Power supply control, with the exception

of powering

ON

and

OFF

, is done by way of the AMI Model 430

Power Supply Programmer. No field adjustments or reconfiguration

of the power supply should be attempted in the field unless

specifically described in this document or recommended in writing

by an AMI Technical Support Representative.

5. Enter a stability setting of 100%. Refer to sections 3.3 on page 29

and 3.7.9 on page 43.

1. If the system shipped with CamLoc quick-disconnect connectors, they may be quickly dis-

connected from the magnet leads and connected together.

Advertising