VEGA VEGATOR 521, 522, 523, 527 User Manual
Page 20
Advertising
20
VEGATOR
value of the two noted values.
Channel 2
Carry out the adjustment like for channel 1.
Then repeat the adjustment with the
adjustment elements for channel 2.
Set the min./max. changeover switch (12) to
"on".
The relay of channel 1 now has the function of
a min./max. relay (hysteresis signal). The
relay of channel 2 still signals the covering of
electrode 2.
If necessary, choose the following
adjustments on the DIL switch blocks (14
and 15):
- switch off delay, switch on delay
- integration time (0.2 … 20 s)
VEGATOR is now ready for operation.
Setup
Advertising