VEGA VEGATOR 521, 522, 523, 527 User Manual

Page 20

Advertising
background image

20

VEGATOR

value of the two noted values.

Channel 2

Carry out the adjustment like for channel 1.
Then repeat the adjustment with the
adjustment elements for channel 2.

Set the min./max. changeover switch (12) to
"on".

The relay of channel 1 now has the function of
a min./max. relay (hysteresis signal). The
relay of channel 2 still signals the covering of
electrode 2.

If necessary, choose the following
adjustments on the DIL switch blocks (14
and 15):
- switch off delay, switch on delay
- integration time (0.2 … 20 s)

VEGATOR is now ready for operation.

Setup

Advertising