3 mounting, Bgt 596, Bgt 596 ex.m – VEGA BGT 596-596 Ex.M User Manual

Page 7: Mounting steps

Advertising
background image

Carrier BGT 596, 596 Ex.M

7

Operating instruction

2.3 Mounting

BGT 596

Except this operating instruction (BA) the BAs

of the installed module cards have to be
observed.

The mounting of the module cards must start

directly after the blind cover mounted on the left

(4 TE = air gap to the side wall of the carrier of

10 mm).

BGT 596 Ex.M

The instructions and mounting steps described
in the following are part of the explosion protec-

tion and must be maintained exactly.

- Ex-module cards must only be operated via

Ex-modules in the carrier.

- The intrinsically safe circuits can be sepa-

rated by means of the supplied separating

chambers.

- The protection IP 20 requested for Ex-appli-

cations must be ensured by a total equip-

ment (module cards and/or blind covers).

- The following installation regulations must be

observed for mixed load.

Examples:

Mounting steps

Step 1

Snap-in the guide rails into the respective

module of the carrier (e.g. module position 5).

Step 2

VEGA-Ex-module
cards

VEGA-not-Ex- and/ or

module cards of other
manufacturers

Blind cover

No distance conditions

VEGA-Ex-module

cards

VEGA-not-Ex- and/
or module cards of

other manufactur-

ers

Blind cover

Distance

6 mm

(min. 2 TE)

3

5

7

06

03

o 31 o

o 29 o

o 27 o

Mount the multipoint connector from the inner

side of the carrier to the rear board.

The max. voltage on the circuits must not exceed
250 V

eff

.

Advertising