4 mounting, 1 general instructions, 2 mounting instructions – VEGA VEGABAR 12 User Manual

Page 10: 3 mounting steps, 4mounting

Advertising
background image

4

Mounting

4

.1 General instructions

Make sure that all parts of the instrument exposed to the process, in
particular the sensor element, process seal and process fitting, are
suitable for the existing process conditions. These include above all
the process pressure, process temperature as well as the chemical
properties of the medium.

You can find the specifications in chapter "Technical data" or on the
type label.

4

.2 Mounting instructions

VEGABAR

12 functions in any installation position.

Information:
We recommend using the measuring instrument holder of the line of
mounting accessory.

4

.3 Mounting steps

For mounting VEGABAR 12, a connection with G1/8" outer thread is
required.

Suitability for the pro-
cess conditions

Mounting position

10

VEGABAR

12

4 Mounting

35544

-EN

-110616

Advertising