Installation Instructions

TH-PT24

Projector | Suspended Ceiling Tile 24"

Component Checklist

IMPORTANT INFORMATION:

! IMPORTANT - Install Telehook Projector - Suspended Ceiling Tile 24" as per Installation Instructions.
! This product supports 1.5” NPT Pole Mounts, Atdec Pole Mount (TH-WH-PJ-CM), and Atdec Flush Mount (TH-WH-PJ-FM).
! Maximum weight capacity 22.7kg (50lbs).
! The manufacturer accepts no responsibility for incorrect installation.

Step 1. Check Components

Check you have received all parts against the Component Checklist and Hardware above.

Step 2. Remove Existing Ceiling Tile

Remove existing ceiling tile from ceiling grid where the product
is going to be installed.

TIP: Also temporarily remove an adjacent ceiling tile to allow easy
access to the product during installation.

Step 3. Fix Anchors to True Ceiling

Uncoil Support Wire and cut into 4 equal lengths. Select the anchoring method appropriate to your ceiling (see below).
NOTE: Each anchor point should be directly above each corner of the Suspended Ceiling Tile.

Wooden Joists

Drill 4x Ø6mm holes, at least 50mm deep
(4x ؼ” holes, 2”deep).
Fully screw Lag Eye bolts into wooden joists.

Solid Concrete

Drill 4x Ø6mm holes, 36mm deep
(4x ؼ” holes 1½” deep).
Tap anchors into hole to an embedded depth
of at least 25mm deep (1” deep).
Using a claw hammer, pull anchor out 6mm
(¼”) to activate anchor.

Truss Beams

Thread one end of Support Wires through the
trusses, and wrap 5 times to secure.

Hardware

M6 Wing

Nut (x4)

M6 Washer

(x8)

Lag Eye

Bolt (x4)

Concrete

Anchor Bolt (x4)

Safety Clamp

(x2)

Thread one end of each support wires through
a Lag Eye Bolt, and wrap 5 times to secure.

Thread one end of each support wires through
a Lag Eye Bolt, and wrap 5 times to secure.

Support Wire (x4)

Lag Eye Bolt (x4)

Concrete Anchor

Bolt (x4)

Support Wire (x4)

Truss Beam

Support
Wire (x4)

Solid

Concrete

Wooden

Joist

M6 Set

Screw (x2)

Turnbuckle

(x4)

Support Wire

Safety Wire

M6x16mm

Screw (x4)

1.5” NPT Upper

Mounting Plate

1.5” NPT Lower

Mounting Plate

1.5” NPT

Mounting

Collar

3mm

Allen Key

Turnbuckle

Hooks

Tools Required:
Phillips head screwdriver
Wire cutters
Power drill
6mm (

1

/

4

”) drill bit

6mm (

1

/

4

”) masonry drill bit

Claw hammer
Jigsaw/Hole cutter
Spirit level

Suspended

Ceiling Tile

Pole Lower

Mounting Plate

Pole Upper

Mounting Plate

Cover Plate

OR

OR

Step 4. Attach Turnbuckles onto Support Wires

Loop each dangling Support Wire through a Turnbuckle, and wrap
5 times to secure.

Make sure that the position of the x4 Turnbuckles are approximately
at the same height.

TIP: The turnbuckle hooks should be level with the top of ceiling grid.

Turnbuckle

(x4)

Support

Wire (x4)