Atdec Telehook TH-PS-D Installation manual User Manual

Page 3

Advertising
background image

Break the Base Cover tab on the side to
allow the cable to exit through slot.

Secure the Base Cover with the
corresponding Security Screws.

Insert cable through Cable Cover and
slide onto the Support Arm.

Step 7. Re-Attach Covers and Cable Cover

Step 8. Attach Projector Mount

Option A

Option B

Ensure there is enough cable length
on either end.

Re-mount the Sliding Pole Mount with the cable fitted either in Option A or B.
This will depend on the projector, projector mount and position of the cable socket.

Reinsert the End Cap and secure with
the corresponding screw.

TH-PF
Projector Mount

The Cable Cover may need to be cut to length depending on where the projector is positioned along the Support Arm.
After the appropriate length has been attained, slide cover back on. Please refer to your projector documentation for
guidance on Focal Length/Throw.

7.1.

7.3.

7.4.

7.5.

7.2.

To complete installation please jump to Step 5 of TH-PF installation manual.

No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd.

Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published 10.04.13 ©

Advertising