13 plumbing (straight-shot) – Banks Power Universal Car & Truck: (Gas or Diesel ’50 - 14 Universal) Water-Methanol: Straight-Shot and Double Shot, Universal applications User Manual

Page 13

Advertising
background image

97650 v.1.0

13

Plumbing (Straight-Shot)

: If you purchased the

Double-Shot system proceed to the
Plumbing (Double-Shot) section.

: Route and secure

tubing where it will not interfere
with moving or hot engine compo-
nents. Avoid sharp turns that may
kink tubing and sharp edges that
may damage tubing.

: Cut tubing using

a Pocket or X-Acto knife to avoid
pinching the tubing. Pinching the
tubing will cause it to not seat
properly.

1.

Secure one end of 1/4” Nylon tub-

ing (P/N 45140) into Push-Lock fitting on
windshield washer fluid reservoir by firmly
pushing tubing into Push-Lock fitting.

Carefully pull on tubing to ensure tubing is
secured properly.

2.

Route tubing to injection pump inlet.

Cut tubing, allowing approximately 1/2”
for securing into injection pump. Properly
secure tubing into injection pump inlet.
See Figure 29

: Make all cuts as

square as possible to avoid leaks.

3.

For a single injection nozzle, secure

and route tubing from pump outlet to
injection nozzle assembly in intake duct.
Properly cut tubing and secure into injec-
tion nozzle assembly.

4.

For two injection nozzles, secure and

route tubing from pump outlet to port
#1 of “Y” fitting (P/N 45123). Properly
cut tubing and secure into “Y” fitting.
See Figure 30

: Determine where you

want Push-Lock “Y” fitting located and
route tubing appropriately. Choose a
location that is easily accessible and
can be checked for leaks.

4a.

Secure tubing in port #2 of “Y” fitting

and route tubing to first injection nozzle
assembly. Properly cut tubing and secure
into injection nozzle assembly.

4b.

Repeat step 4a for second injection

nozzle assembly using port #3 on the
“Y” fitting.

5.

Use tie wraps to secure all tubing.

Figure 30

Figure 29

Advertising