De c b a – Peerless-AV ACC912 - Installation User Manual

Page 5

Advertising
background image

ISSUED: 03-26-03 SHEET #: 055-9213-2 11-10-04

For customer service call 1-800-729-0307 or 708-865-8870.

Visit the Peerless Web Site at www.peerlessindustries.com

5 of 5

Attach upper ceiling bracket (A) to lower ceiling bracket (B) by inserting four carriage bolts (C) through holes of
ceiling brackets (A & B). Fasten bolts (C) with four washers (E) and nylock nuts (D) as shown.

Note: Adjust lower ceiling bracket (B) until it is level before tightening nuts (D).

D

E

C

B

A

Screw extension column into lower ceiling bracket (B) and align slot of
extension column with one of the holes in lower ceiling bracket (B). Thread M5
x 10 mm self-tapping screw (G) through lower ceiling bracket (B) into
extension column as shown in detail 1.

Note: 3/4" extension column (FLP series) can be used in place
of the EXT or ADJ series. Two pipe reducers (ACC 913) are
required for installing the 3/4" column.

1-1/2" Extension Column Application (EXT or ADJ series)

B

G

EXTENSION
COLUMN

DETAIL 1

SLOT

©

2004 Peerless Industries, Inc. All rights reserved.

Peerless is a registered trademark of Peerless Industries, Inc.
All other brand and product names are trademarks or registered trademarks of their respective owners.

Advertising