Warning, Da i, Installation to metal studs – Peerless-AV GC-PS3S - Installation User Manual

Page 5: Figure. 1.4

Advertising
background image

5 of 7

ISSUED: 1-17-11 SHEET #: 125-9181-1

1

• Drywall must be 1/2" or thicker, and metal stud must be 24 gauge or thicker.
• Make sure that the wall will safely support the combined load of the equipment and all attached hardware and

components.

• Make sure that togglers are anchored into the center of the studs. The use of an "edge to edge" stud finder is highly

recommended.

WARNING

Installation to Metal Studs

Rotate toggler (

I) clockwise to wedge it against

inside walls of metal stud.

Push into hole.

Pivot end of toggler (

I).

Slide plastic cap forward while pulling back

firmly on ring.

Break off excess.

I

1

2

3

4

5

fig. 1.3

drill

1/2"

hole

I

I

I

I

METAL STUD

D

A

I

Figure. 1.4

Using a stud finder, locate and mark the edges of the metal stud used in mounting this product. Use of an edge to

edge stud finder is highly recommended. Use a level to draw a level, vertical line down the center of the stud. Level

wall plate (

A), and mark the center of the two mounting holes. Make sure that the mounting holes are on the stud

center lines. Drill two 1/2" holes through drywall and metal studs.

NOTE: It may be necessary to drill 5/32" pilot

holes prior to drilling 1/2" holes. Install togglers (

I) as shown in figure 1.3. Loosely fasten wall plate to wall using two

1/4-20 x 1.5" screws (

D) using 4 mm allen wrench (H) as shown in figure 1.4. Level, hold,

and then tighten all screws.

PlayStation

®

3

Advertising