Aqua-Pure CSM1501 User Manual

Page 9

Advertising
background image

Step 13

Set time of day (refer to appropriate How To Set Time Clock/Meter Regeneration Control, Section 3). When shifting to daylight saving time (and back), you may
wish to adjust time of day accordingly.

NOTE: time of regeneration is preset for 2:00 a.m. because at this time water consumption is generally minimal (a built-in hard water bypass does, however,
permit water to be drawn during regeneration). Should your life style require regular use of water during the 2:00 to 3:00 a.m. regeneration period, or if other
water treatment equipment is also set for 2:00 a.m. regeneration, the time of regeneration will need changing. Refer to Section 3, How To Set Time Clock Re-
generation Control, for adjustment procedure.

Step 14

Before loading salt, using a pail or garden hose, add approximately 3 gals. water to brine tank (6 gals. for units with extended grid legs). Then add initial salt fi ll
to brine tank, and one cup full of unscented laundry bleach to brine well.

Step 15

Put softener through complete regeneration to sanitize the system before use (Refer to How To Set Time Clock (or Meter) Regeneration Control for instructions on
manual regeneration). Restore fuel supply or power to water heater.

Installation is now complete, and your water softener is now ready for service!

SPECIAL SERVICE INSTRUCTIONS:

Under normal circumstances removal of the valve should not be required. However, if it must be removed, disconnect the plumbing attached to the bypass valve
fi rst. Then, rotate the valve head assembly to the left or counter-clockwise. Before attempting any disassembly, pressure should be relieved by shutting off water
to the system and opening a faucet. Upon reassembly, all o-rings should be lubricated with silicone grease. Reattach valve head assembly by rotating to the right
or clockwise until valve head assembly is seated to the tank hand tight. Reconnect the plumbing to the bypass valve.

2-4

Advertising