Busway Plugs Installation Instructions

Figure 1. Plug mounting.

Figure 2. Break-Off Tabs


WARNING: HAZARD AND ELECTRICAL SHOCK

OR BURN! The plug must be turned OFF before

installing on or removing from the busway.

Failure to do so may cause serious injury or

death! It is a good safety to de-energize the

busway before inserting or removing bus plugs.

In the United States, it is necessary to comply

with all Federal and local safety procedures,

including NFPA 70E 2-1.3 directing the use of

appropriate PPE (Personal Protective Equipment)

such as face shield, insulating gloves, and flame

resistant clothing. In Canada, be sure to comply

with the appropriate requirements of the

Canadian Electrical Code. Only properly trained

personnel may install bus plugs on or remove

them from energized busway. In addition, all bus

plug installation instructions must be followed

completely.

Note the following points concerning busway
plugs:
• Inspect the plug before installing on the

busway.

• Stab fingers have been lubricated with

grease, which should not be removed.

• Dripproof plug-in busway has a dripproof

cover over the outlet. Unscrew the cover and
reattach the cover to the left side of the outlet,
using the screw on the right side of the cover.
This relocates the cover so it is out of the way

for plug insertion.

• The actuator bar polarizes and locates the

plug in the correct position only.

• Plugs are interlocked, permitting engagement

and disengagement with the busway only
when in the OFF position.

• Place the operating handle at the desired

position on the plug and secure it with the
screw provided. The NEC requires the ON