GE Industrial Solutions EntelliGuard G Ready To Close User Manual

Page 3

Advertising
background image

Figure 6. Connector Plug Assembly


8.

To reinstall the cover, rotate the charging

handle down and slide the front cover over the
handle to assemble the front cover to housing as
shown in Fig. 7.

Figure 7.


9. Ensure the fascia is aligned properly with the
trip unit and the pad lock features of the breaker.


10

.

Fasten the 6 mounting screws of fascia with

the housing using a pozidrive screwdriver. Apply
torque of 6 Nm (4.42ft-lbs).
















3

Advertising