GE Industrial Solutions ProTrip Conversion Kits DB-15 User Manual

Page 8

Advertising
background image

5. Tighten the

1

/

2

-13 x 1

1

/

2

" CT assembly bolts inserted

in step 3 to 300 in-lb, as shown in Figure 9. Tighten
the

3

/

8

-16 x 1

1

/

4

" bolts inserted in step 4 to 200 in-lb.

6. Tighten the CT post bolts inserted in step 1 to 200 in-

lb, as shown in Figure 10.

WARNING: Steps 5 and 6 provide critical electrical
integrity connections. The designated bolts must be
correctly tightened for proper operation. Failure to
tighten these bolts properly will cause a breaker failure,
resulting in property damage and/or personal injury.

Figure 9. Tightening the CT assembly mounting bolts.

Figure 10. Tightening the CT assembly bolt.

8

Advertising