GE Industrial Solutions ProTrip Conversion Kits DB-15 User Manual
Page 8
Advertising
5. Tighten the
1
/
2
-13 x 1
1
/
2
" CT assembly bolts inserted
in step 3 to 300 in-lb, as shown in Figure 9. Tighten
the
3
/
8
-16 x 1
1
/
4
" bolts inserted in step 4 to 200 in-lb.
6. Tighten the CT post bolts inserted in step 1 to 200 in-
lb, as shown in Figure 10.
WARNING: Steps 5 and 6 provide critical electrical
integrity connections. The designated bolts must be
correctly tightened for proper operation. Failure to
tighten these bolts properly will cause a breaker failure,
resulting in property damage and/or personal injury.
Figure 9. Tightening the CT assembly mounting bolts.
Figure 10. Tightening the CT assembly bolt.
8
Advertising