GE Industrial Solutions Spectra Series Fusible Switch Units J & T User Manual

Spectra series™ fusible switch units, Installing the expansion kit, 200 ampere expansion kit (j and t fuses)

Advertising
background image

g

Spectra Series™ Fusible Switch Units

200 Ampere Expansion Kit (J and T Fuses)

WARNING: Danger of electrical shock or injury.

Turn

OFF power ahead of the panelboard or

switchboard before working inside the

equipment or removing any component

.

Do

not remove circuit protective devices or any

other component until the power is turned

OFF.

Installing the Expansion Kit

1. Remove the switch. Loosen the rail latch screws and

remove the switch by pulling up on the latch handles

while pulling the device from the equipment, as

shown in Figure 1.

2. Prepare the enclosure. Remove and discard the

blank cover and the bottom insulator from the

bottom of the device, as shown in Figure 2.

3. Install the straps. Install the connecting straps with

the #10-32 x

1

/

2

" screws provided, as shown in Figure

3. Tighten the screws to 27–32 in-lb.

Figure 1. Removing the switch from the equipment.

Figure 2. Removing the blank cover and bottom insulator.

Figure 3. Installing the connecting straps.

GEH5582 Installation Instructions

R02

Rail Latch

Screw

Latch

Handle

Bottom

Insulator

Blank

Cover

Strap

#10-32

Screw

Advertising
Table of contents