Geh-5582p3-p4, For two-pole devices on three-phase systems – GE Industrial Solutions Spectra Series Fusible Switch Units J & T User Manual

Page 3

Advertising
background image

6. Install the cover. Install #10-32 x

1

/

4

" screws into the

mechanism shroud mounting holes, as shown in

Figure 8. Position the new enclosure cover in place

on the enclosure and secure with #10-32 x

1

/

4

"

screws. Tighten all screws to 27–32 in-lb. Reinstall the

switch into the panelboard and secure the rail latch

locking screws.

Figure 8. Installing the cover on the enclosure.

For Two-Pole Devices on Three-Phase

Systems

To balance the panelboard load, remove the screws on the

appropriate bus clip, reposition the bus clip as shown in

Figure 9, then install and tighten the screws to 27–32 in-lb.

Figure 9. Repositioning the bus clip to balance the load.

A & C Phase
As Received

A & B Phase

B & C Phase

Enclosure

Cover

Mounting

Holes