Geh-5581p2 – GE Industrial Solutions Spectra Series Power Panelboards 60 A_600 V, 100 A_240 V, 100 A_600 User Manual

Page 2

Advertising
background image

4. Prepare the switch. Remove and save the hex nuts

from the studs and red arc cover on the expansion

switch. When installing a 60- or 100-ampere, 600-volt

expansion switch, you must bend the expansion

switch unit 10 to 15 degrees, as shown in Figure 4.

Figure 4. Preparing the switch for installation.

5. Install the kit. Position the load side of the expansion

plate down into the enclosure, then place the switch

base over the connecting straps, as shown in Figure 5.

Replace the hex nuts on the plate studs and tighten

to 27–32 in-lb.

Figure 5. Install the expansion switch into the enclosure.

6. Make the electrical connections. Install #10-32 screws

with washers into the connecting straps inside the

switch base, as shown in Figure 6, and tighten the

screws to 27–32 in-lb. Replace the red arc cover onto

the switch and tighten the screws to 9–11 in-lb.

Figure 6. Making the electrical connections.

7. Install the screws. Tighten the switch base screw to

27–32 in-lb, as shown in Figure 7. Install the #10-32 x

1

/

4

" handle assembly mounting screws into the

mechanism shroud mounting holes and tighten to

27–32 in-lb.

Figure 7. Installing the handle mounting screws.

Expansion

Switch Unit

Red Arc

Cover

Bend (for 60 or 100

A, 600 V switch only,

bend 10–15°)

Hex Nuts

Insert Load

Side of Switch

(Plate) First

Install Hex

Nuts on Plate

Studs

#10-32 Screw

with Washers

Handle Assembly

Mounting Screws

Switch Base

Screw

Advertising