GE Industrial Solutions A Series Lighting Control Panelboards Installation User Manual

Page 3

Advertising
background image

3. Remove dead front shield in preparation of wiring the line and branch breakers of the interior. Keep

mounting screws handy for re-assembly. Secure line side wires and load wires to branch breakers neutral

lugs if service requires and ground connections using the tightening torque specifications in table 2 below.

TABLE 2

TORQUE VALUES FOR

PANELBOARD HARDWARE

SCREW SIZE

TORQUE

(IN-LBS)

#4 STEEL

16

#10 PLASTIC

16

#8 CU/ AL/STEEL

24

#10-32 CU/ AL/STEEL

32

1/4-20 AL/<.150 THICK CU

44

1/4-20 .150 THICK CU

60

5/16-18 CU/ AL/STEEL

110

3/8-16 CU/AL/STEEL

220

1/2-13 CU/AL/STEEL

220

4. Refer to address chart provided with rating booklet DEH40007 and record load locations in preparation for

setting load-scheduling times into the programmable controller. Refer to instruction DEH41080 for proper

controller installation and wiring diagrams.















16 External Inputs (under cover)

Input power (removal terminal)

RS 485

Note:
Controller is powered internally. No control power

is required.

Power in control box is class II low voltage.

Electro static discharge sensitive. The installer

should be grounded when handling controller.

Service port

RS 485 Subnet

Dry Contact output

Ethernet

Dipswitches (under cover)

4 REMOVABLE 1 / 2 INCH KNOCKOUT
PLUGS PROVIDED 2 PER SIDE FOR
OVERRIDE TERMINALS

Analog Input

Local Override Input

2 REMOVABLE 1 / 2 INCH
KNOCKOUT PLUGS PROVIDED
FOR PERMANENT CONTROL
AND ETHERNET WIRING.

RS 232

Battery (under cover)
PANASONIC CR2032 (3V)
or equiv.

For protection of control wire between control box and
panel box options include:

1) Shrink tubing sleeve rated for 600V

2) Flexible metal or non-metallic conduit

3) GE kit catalog No. ASRGLCCWT

- 3 -

Advertising