Installing the Flux Shifter Assembly

The installation procedure for the flux shifter assembly,
illustrated in Figure 3, varies depending on the type of
breaker and existing trip device. In some cases,
mounting holes must be added, terminal blocks
relocated, or breaker side rails removed.

Breakers with EC or Power Sensor Trip Systems

1. Drill the flux shifter mounting holes in the left side of

the breaker frame. The mounting hole pattern is
illustrated in Figure 4. A full-size template is provided
in the Appendix.

2. Mount the new flux shifter to the inside of the side

frame with the three screws, lock washers, flat
washers, and nuts supplied, as shown in Figure 5.
Insert the screws from the outside of the side frame.

Figure 3. Flux shifter assembly.

Figure 4. Pattern for flux shifter mounting holes in the

side frame.

Mounting

Screws

Flux Shifter

Assembly

Figure 5. Flux shifter assembly mounted to the side

frame.