Installing the flux shifter assembly, Breakers with ec or power sensor trip systems, Flux – GE Industrial Solutions ProTrip Conversion Kits AK-50, AKU-50, AKS-50, AKT-50, AK-75, and AK-100 User Manual
Page 6: Shifter assembly, Flux shifter assembly mounted to the side frame
Installing the Flux Shifter Assembly
The installation procedure for the flux shifter assembly,
illustrated in Figure 3, varies depending on the type of
breaker and existing trip device. In some cases,
mounting holes must be added, terminal blocks
relocated, or breaker side rails removed.
Breakers with EC or Power Sensor Trip Systems
1. Drill the flux shifter mounting holes in the left side of
the breaker frame. The mounting hole pattern is
illustrated in Figure 4. A full-size template is provided
in the Appendix.
2. Mount the new flux shifter to the inside of the side
frame with the three screws, lock washers, flat
washers, and nuts supplied, as shown in Figure 5.
Insert the screws from the outside of the side frame.
Figure 3. Flux shifter assembly.
Figure 4. Pattern for flux shifter mounting holes in the
side frame.
Mounting
Screws
Flux Shifter
Assembly
Figure 5. Flux shifter assembly mounted to the side
frame.
6