GE Industrial Solutions EntelliGuard G Shunt Trip (Extended Range) User Manual

Page 2

Advertising
background image

Figure 1. (A) Front Cover (B) Screw Removal (C) Handle

Rotation


4. This accessory is mounted on the mechanism
top plate at 1

st

or 4

th

location as shown in Fig.

2.

Figure 2.


5. Tilt the coil forward and engage the front hooks
into the mechanism top support plate as shown
in the Fig. 3. Tilt the device backwards until the

rear hooks engage in the slots on the mechanism
top support plate as shown in the Fig. 4


Figure 3. Shunt Trip inserting.


1

4

Figure 4. Shunt Trip assembly



6. After installing the shunt release on the
mechanism top plate, connect the input wire

assembly plug to the A5/A6 if installed (1

st

Location) or A12/A13 (4

th

Location)

Locations marked on the secondary disconnect
as shown in Fig. 5.

2

Advertising