GE Industrial Solutions GE TR5000 Series User Manual

Page 14

Advertising
background image

2020004403 (12/09) Page 14 of 18

POWER WIRING AND REMOTE ALARM LOCATIONS














































Labeled “Phase A”

(Black)

Labeled “Phase B”

(Black)

Labeled “Phase C”

(Black)

Ground

(Green)

Neutral

(White)

Power Wiring

Alarm Contacts

COM

(Yellow)

NC

(Blue)

NO

(Orange)

Remote Contact Status

Modes

Normal Indication:

NO – COM = Closed

NC – COM = Open

Alarm Indication:

NO – COM = Open

NC – COM = Closed

The above illustration represents the wiring and alarm contacts for all TR5 Wall Mounted SPD for 3 phase

applications. (Split/Single phase versions will have only 2 black power wires for connection.)

Black Wires are marked and identified as Phase A, Phase B, Phase C.

Various mounting orientations are possible and will not affect the performance of the SPD if wire connections

and cable length are kept to a minimum.

Notice For High Leg Delta Power Systems:

SPD model types that are intended for High Leg Delta applications are configured and marked with

Phase B as the intended High Leg connection point. Attempting to connect the SPD Phase C or

Phase A conductor to the system High Leg will result in immediate SPD failure.

Advertising