Step 3- operation – GE Industrial Solutions Record Plus Plug-In Bases: FC100 User Manual

Page 5

Advertising
background image

PROVIDE THIS CUT OUT
IF SECONDARY DISCONNECT
IS USED

Figure9.Drilling Plan for Mounting Panel

Figure 10.Breaker installation.

[14]


















Step 3- Operation

1. With breaker in OFF position, install breaker

by aligning male plugs with tulip connection
and pressing firmly in place, as illustrated in
Figure 10.

2. Connect the Secondary disconnect wires to

the internal accessories mounted in the
breaker.

3. Install the breaker on plug-in base as per

FC100 breaker installation instruction
[DEH40463].


Figure 8 is the outline view of completed
installations with dimensions. Figure 9 illustrates
the drilling plan for mounting panel.







Advertising