GE Industrial Solutions EntelliGuard G Closing Coil User Manual

Page 2

Advertising
background image

Figure 1. (A) Front Cover (B) ScrewRemoval (C) Handle

Rotation

4. This accessory is mounted on the mechanism
top plate at 3

rd

location as shown in Fig. 2.

Figure 2.

5. Tilt the coil forward and engage the front hooks
into the mechanism top support plate as shown
in the Fig.3.

Figure 3. Insert top plate

6. Tilt the device backwards until the rear hooks
engage in the slots on the mechanism top
support plate as shown in the Fig. 4.

3

Figure 4. Snap on

7. After installing the closing coil on the
mechanism top plate, connect the input wire
assembly plug to the A9-A10 locations marked on
the secondary disconnect as shown in Fig. 5.

Figure 5. Wire assembly

2

Advertising