GE Industrial Solutions EntelliGuard G Closing Coil User Manual

Page 3

Advertising
background image

8. Ensure that the plug in connection is firm and
that the plug is inserted into the correct terminals

.

10. Ensure the fascia is aligned properly with the
trip unit and the pad lock features of the breaker.

9

. To reinstall the cover, rotate the charging

handle down and slide the front cover over the
handle to assemble the front cover to housing as
shown in Fig. 6.

11. Fasten the 6 mounting screws of fascia with
the housing using a pozidrive screwdriver. Apply
torque of 6 Nm (4.42 ft-lbs).

Figure 6.

3

Advertising