GE Industrial Solutions EntelliGuard G Back Connected Terminations for Cassette User Manual

Page 4

Advertising
background image

Back Connected Terminations Assembly (4 Pole)
Procedure:

1. Similar Procedure to be followed for 4 pole

breaker with neutral on right or left.

2.

For 4 Pole breaker, assemble the L2 pole with

two heat sinks first. Then assemble the
adjacent poles with only one outer heat sinks.
Refer Fig H – Fig L.





































































Fig K. Envelope 2, 3200A ANSI 4 Pole, Neutral

Right

L3

N

L1

L2

L3

N

L1

L2

Fig H. Envelope 2, 3200A ANSI 4 Pole, Neutral Left, Top
view

L3

N

L1

L2

L3

N

L1

L2


Fig J. Envelope 2 , 3200A ANSI 4 Pole ,Neutral Right, Top view

Fig L. Envelope 2, 3200A ANSI 4 Pole Side view

Fig I. Envelope 2, 3200A ANSI 4 Pole, Neutral left, top
View

4

Advertising