GE Industrial Solutions EntelliGuard G Back Connected Terminations for Cassette User Manual
Page 4
Advertising
Back Connected Terminations Assembly (4 Pole)
Procedure:
1. Similar Procedure to be followed for 4 pole
breaker with neutral on right or left.
2.
For 4 Pole breaker, assemble the L2 pole with
two heat sinks first. Then assemble the
adjacent poles with only one outer heat sinks.
Refer Fig H – Fig L.
Fig K. Envelope 2, 3200A ANSI 4 Pole, Neutral
Right
L3
N
L1
L2
L3
N
L1
L2
Fig H. Envelope 2, 3200A ANSI 4 Pole, Neutral Left, Top
view
L3
N
L1
L2
L3
N
L1
L2
Fig J. Envelope 2 , 3200A ANSI 4 Pole ,Neutral Right, Top view
Fig L. Envelope 2, 3200A ANSI 4 Pole Side view
Fig I. Envelope 2, 3200A ANSI 4 Pole, Neutral left, top
View