GE Industrial Solutions EntelliGuard G Undervoltage Release User Manual

Page 2

Advertising
background image



Figure 1. (A) Front Cover (B) Screw Removal (C) Handle

Rotation


4. This accessory is mounted on the mechanism.
Top plate at 2

nd

or 4

th

location as shown in Fig. 2.


Figure 2.



5. Tilt the coil forward and engage the front

hooks into the mechanism top support plate as
shown in the Fig. 3.

Figure 3. Insert top plate

6. Tilt the device backwards until the rear hooks
engage in the slots on the mechanism top
support plate as shown in the Fig. 4

2

4

Figure 4. Snap on.


7. After installing the UV on the mechanism top
plate, connect the input wire assembly plug to the
A7/A8 if installed (2

nd

location) or A12/A13 (4

th

location) marked on the secondary disconnect as

shown in Fig. 5.

2