SECTION II - OPERATION AND FEATURES

(Continued)

3. BYPASS-ISOLATION OPERATION - 600-1200 AMP

a. Automatic

1) Manually operated bypass switch contacts (BN/BE) are

open and ATS is supplying load.

2) Disconnect Switch (DS) is in Auto.

b. To Bypass ATS

1) Open bottom cabinet door and turn DS to Inhibit.
2) Turn Bypass Selector Switch (BSS) to same power source

as ATS.

3) Move the Manual Bypass Handle (MBH) upward.

c. To Test ATS

1) Bypass per above instructions.
2) Rotate crank mechanism counterclockwise until ATS Test

light is illuminated.

3) Turn DS to Auto.
4) Test Switch (TS) on bottom cabinet door will allow electrical

operation of ATS.

d. To Isolate ATS

1) Bypass per above instructions.
2) Rotate crank mechanism counterclockwise until ATS

Isolated light is illuminated.

e. To Remove ATS

1) Bypass and isolate per above instructions.
2) Disconnect multipin plugs and external connections to ATS.
3) Rotate four power panel latches to vertical position, slide

ATS forward and lock mechanism in place.

4) ATS can now be removed from cabinet.

f. To Reconnect ATS

1) Place ATS in slide mechanism.
2) Unlock slide mechanism. Slide ATS over power panel

latches and rotate latches to horizontal position.

3) Turn DS to Inhibit.
4) Manually position ATS into same source as bypass switch.
5) Reconnect multipin plugs and external connections to ATS.
6) Rotate crank mechanism clockwise until ATS Test light is

illuminated.

7) Turn DS to Auto and use TS to electrically operate ATS.
8) Turn DS to Inhibit.
9) Move ALH to Auto location.
10) Turn DS to Auto and open bypass with MBH.
11) ATS is now fully automatic.

Legend:
1.

BP - Bypass Switch

(indicated by contacts
BN/BE) is a three posi
tion switch.

2.

ATS - Automatic Transfer
Switch.

Notes:
1. DS in Inhibit will prevent ATS

electrical operation.

2. Do not use excessive force on

mechanical handles.

3. Figures depict Bypass Normal.

Sequence is the same for
Bypass Emergency.

4. When ATS is in Test or Isolate,

bypass switch is manual transfer
switch to either available source
(indicated on light panel).

5. To operate bypass switch when

ATS is in Test or Isolate:
a) Move MBH downward (to open

open Bypass Contacts BN/BE).

b) Turn BSS to opposite power

source.

c) Move MBH upward to close

into selected power source.