GE Industrial Solutions ZBTSCTH SERIES 100 - 4000 AMPS User Manual
Page 3
Section I
INSTALLATION
1. Requirements
2. Equipment Inspection and Storage
3. Mounting
4. Power Connections
5. Control Connections
6. Final Equipment Inspection
7. Functional Test
Section II
OPERATION AND FEATURES
1. Sequence Of Operation
2. Bypass-Isolation Switch Operation
3. Zenith Standard Package
4. Zenith Optional Accessories
Section III
MAINTENANCE AND TESTING
1. Inspection and Cleaning
2. Servicing
3. Testing
4. Troubleshooting
5. Emergency Service Procedure/Extended Parallel Time
Section IV
ADJUSTMENTS AND SETTINGS
1. Paralleling Relay Settings
2. Solid State Timers
3. Voltage/Frequency Sensor (VFSM)
4. Solid State Phase Relay (ARSM)
5. Paralleling Window Under-Overvoltage Sensing Relay
6. Electronic Time Switch Z2000-2A
Appendix A
TYPICAL SCHEMATIC DIAGRAMS
1. 100-400 Amps
2. 600-3000 Amps
3. Alarm Circuit Schematic
4. Three-Phase Control Sensing Schematic
5. Bypass Control Circuit
Appendix B
REPLACEMENT PARTS
1. Power Panel — 100-400 Amps
2. Power Panel — 600-1200 Amps
3. Power Panel — 1600-3000 Amps
4. Bypass Subpanel
5. Control Panel Layout and Parts List
6. Cabinet Door Pilot Devices
TABLE OF CONTENTS
2
2
2
2
3
4
5
5
6
6
8
11
11
12
12
12
12
13
14
16
16
16
16
17
17
17
19
19
20
21
21
22
23
23
23
24
24
28
31