Step 3, Wire Terminal Connections

Check to make sure all terminals are torqued to

the proper value. Reinstall the terminal (IP20)

covers insuring that they are firmly seated, see

figure 5.

150A-Lug Kit FCAL15 (Al)
Cu/Al wire, strip length-9/16 – 11/16 inch (14 – 18mm)
#14 - 12AWG Torque to 35 lb-in (3.95 Nm)
10 - 6AWG Torque to 70 lb-in (7.90 Nm)
#4-3/0AWG Torque to 150 lb-in (16.95Nm)
250A - Lug kit FCAL16 (Al)
Cu/Al wire, strip length- 3/4 – 7/8 inch (19 – 23mm)
#8 - 1AWG Torque to 175 lb-in (19.8Nm)
#1/0 – 350Kcmil Torque to 275 lb-in (31Nm)

250Kcm max with Cu wire

Warning: Danger! It is important that the

terminal covers be installed correctly to ensure

proper circuit breaker operation, see figure 5.
Important: Danger! Il es import de verifier que

tout cuvercle ou cache de protection est
correctement installe afin d'assurer le bon

fonctionnement de l'appareil.

Table 2

Rating Plug

Type

FERP3…

Breaker

Sensor

Amps

25 60 125 150 250

Color Code

Light

Grey White Brown Yellow

Orange

Rating Plug

Amps

3

7

10

15

20

B0020

25 B0025

D0025

30

D0030

35

40

D0040

45

50

D0050

G0050

55

60

D0060

G0060

70

G0070

H0070

80

G0080

H0080

90

G0090

H0090

100

G0100

H0100

K0100

110

G0110

H0110

K0110

125

G0125

H0125

K0125

150

H0150

K0150

175

K0175

225

K0225

250

K0250

Note: When using aluminum wire, use a joint

compound recommended by the wire manufacturer.
Important: Dans les cas d'emploi de cable

aluminum, utilizez le lubricant recommende by par

le fabricant.

Figure 1,

Figure 2, Breaker mounting, Escutcheon and orientation

Step 1, Unpack and inspect

Unpack the breaker and inspect it for any

shipping damage. Ensure the breaker has the

proper ampere, voltage and interrupting

ratings for the application. Next, using the

instructions supplied with the rating plug,

install the plug into the main breaker body.

Available rating plugs along with catalog

numbers are listed in Table 2 and shown in

Figure1, (see color-coding). Now install the

accessories (Step 9) and terminal lugs (Step

3) using supplied installation instructions.

Check all accessories for proper voltage

ratings, installation, wiring routing and

operation. Attach appropriate labels to side of

the breaker if internal accessories have been

installed.

Step 2, Installation

Using Figure 2, drill and tap all mounting

holes and make any necessary front panel

escutcheon cut outs. Using the breaker

hardware kit, FEMSK1 - which includes four

#10-32 x 2-7/8in screws and lock washers or

FEMSK3 - which includes four #8-32 x 2-

7/8in screws and lock washers, mount the

breaker.

Torque #8-32 screws to 20 lb-in (2.25Nm)

and the #10- 32 screws to 32 lb-in (3.6Nm).


Table 1 - Dimensions for figure 2

E

35 mm

1.38 in

B 87 mm 3.43 in F

64 mm

2.52 in

C* 34 mm 1.34 in G* 96.2 mm 3.78 in

D 27 mm 1.06 in H 125.5 mm 4.94 in

* With security cover, without C = 31.8mm(1.25in) and G

= 92.13mm(3.627in)

Advertising