GE Industrial Solutions A-Series II Panelboards THQB User Manual

Page 4

Advertising
background image

DEH40158

DEH40158 Rev.No.01

4

Figure 3. Attaching the shield insert to the shield for THQB breaker installation in

A-Series

®

II Panelboards.


9. If THQB breaker has to be installed after SG or SF/TFJ or SE/TED/FB/TQD as

shown in Figure 4 then gap between the breakers (dim A) has to be followed as
mentioned in Table 2. Replace the subsequent blank filler of dead front with
THQB filler plate given in kit using steps 9 to 11.

10. If THQB breaker has to installed immediate after crossbar as shown in Figure 5

then gap between the breaker and crossbar has to be 0.06inch.














Advertising