GE Industrial Solutions PowerVac PV-VL 13.8-1000-0 and -1 User Manual

Page 3

Advertising
background image

GEH 6468A - Power/Vac VL Breaker

Page 3

CONTENTS

1. INTRODUCTION

5

11.3 CONTACT GAP

30

1.1 SAFETY

5

11.4 CLOSE COIL PLUNGER GAP

31

11.5 TRIP COIL PLUNGER GAP

31

2. DESCRIPTION

5

11.6 CONTROL SWITCH ADJUSTMENT

31

3. RECEIVING, HANDLING AND STORAGE

6

12. ELECTRICAL CHECKS

31

3.1 RECEIVING

6

12.1 ELECTRICAL OPERATION

31

3.2 HANDLING

6

12.2 HIGH-POTENTIAL TEST

31

3.3 STORAGE

6

12.2.1 PRIMARY CIRCUIT

31

3.4 PACKING LIST

6

12.2.2 SECONDARY CIRCUIT

32

12.3 PRIMARY CIRCUIT RESISTANCE

32

4. INITIAL INSTALLATION PROCEDURES

7

12.4 VACUUM INTEGRITY TEST

32

4.1 DOOR WIRING INTERFERENCE

7

12.5 INSULATION TESTS

33

4.2 POSITIVE INTERLOCK
TEST PROCEDURES

7

13. CHECKING AND INSTALLATION

33

4.3 BY-PASS KIT INSTALLATION

7

4.4 CHECKING FOR PROPER INTER-

14. MAINTENANCE

33

LOCK AND TRIP FREE FUNCTIONS

14.1 GENERAL

33

BEFORE LOWERING THE BREAKER

14.2 SERVICE CONDITIONS

34

FROM THE ELEVATED POSITION

8

14.3 FAULT INTERRUPTION

34

14.4 CONTACT EROSION

34

5. ADJUSTMENTS TO BREAKERS /

14.5 TRANSFER FINGER WEAR

35

SWITCHGEAR INTERFACES

8

14.6 MECHANISM

35

5.1 STATIONARY AUXILIARY SWITCH

8

14.7 PRIMARY INSULATION PARTS

35

5.2 PRIMARY

CONTACT PENETRATION

9

14.8 LUBRICATION

35

5.3 POSITIVE INTERLOCK

9

14.9 RECOMMENDED MAINTENANCE

35

5.4 SECONDARY COUPLER

10

5.5 SPRING DISCHARGE CAM

10

15. TIMING

36

5.6 STOPS

10

5.7 GROUND

10

16. OPENING AND CLOSING SPEED

36

5.8 POSITION SWITCH

10

17. REPAIR AND REPLACEMENT

36

6. TYPICAL WIRING DIAGRAMS

11

17.1 GENERAL

36

17.2 REPLACING INTERRUPTERS

36

7. FEATURES

27

17.3 PRIMARY DISCONNECTS

37

7.1 SAFETY PRECAUTIONS

27

17.4 MECHANISM

37

7.2 INTERLOCKS

27

17.5 CONTROL SWITCHES

37

7.2.1 RATING INTERFERENCE PLATE

27

17.6 TRIP COIL REPLACEMENT

37

7.2.2 POSITIVE INTERLOCK SYSTEM

27

17.7 CLOSING COIL REPLACEMENT

37

7.2.3 SPRING DISCHARGE SYSTEM

27

17.8 AUXILIARY SWITCH
REPLACEMENT

37

17.9 MOTOR REPLACEMENT

38

8. OPERATION

28

17.10 “Y” RELAY REPLACEMENT

38

8.1 CLOSE SPRING CHARGING

28

8.2 CLOSING OPERATION

29

18. RENEWAL PARTS

38

8.3 OPENING OPERATION

29

18.1 ORDERING INSTRUCTIONS

38

8.4 TRIP-FREE OPERATION

29

19. MECHANICAL ADJUSTMENTS

38

9. CONTROL CIRCUIT

29

19.1 GENERAL

38

19.2 WIPE ADJUSTMENT

38

10. MECHANICAL CHECK AND

19.3 CONTACT GAP ADJUSTMENT

39

SLOW CLOSE

29

19.4 TRIP COIL PLUNGER

39

10.1 VISUAL INSPECTION

29

19.5 CLOSE COIL PLUNGER

39

10.2 CLOSING SPRING CHARGING

29

19.6 CLOSE SPRING INTERLOCK

39

10.3 CLOSING SPRING GAG

30

19.7 POSITIVE INTERLOCK

39

10.4 SLOW CLOSING

30

10.5 GAG TOOL REMOVAL

30

11. DIMENSIONAL CHECKS

30

LIST OF ILLUSTRATIONS

4

11.1 PRIMARY CONTACT EROSION

30

INDEX

70

11.2 SPRING WIPE

30

STATIONARY CUBICLE INFORMATION

62

Advertising