Akr 30/50 mounting bracket installation – GE Industrial Solutions Remote Racking Operator: Low Voltage AKR Circuit Breakers User Manual

Page 7

Advertising
background image

Remote Racking Operator for AKR Breakers

7

Installation of the AKR 30/50 Remote Racker

Mounting Bracket Kit – AKR3050EGBRMOD


When looking at the front of the breaker, locate
the (2) mounting holes that are already

punched in the frame on the left side of the
escutcheon. They are located behind the
nameplate on the breaker.

Install the mounting bracket that came with

your kit. Align the (2) holes on top of the bracket
with the (2) holes on the frame. Install the (2) ¼-

20 flat washers, lock washers and bolts through

the frame and into the bracket. Torque the
bolts to 7 – 10 ft.-lbs. Do not over torque. Make
sure that the flat portion of the bracket with the
key way is facing outwards. See picture below.

After the bracket has been mounted, the
breaker is ready to be installed into the cubicle.


The existing racking screw mechanism needs to
be inspected for excessive wear and be
properly lubricated.







Nameplate

Mounting Bracket

Figure 4

AKR 30/50 Mounting Bracket Installation

Advertising