GE Industrial Solutions AF-600 FP Panel Through Mount Kit User Manual

Page 3

Advertising
background image

1.3 Preparation

1.3.1 Preparing the Panel Cut-Out and Fixing Holes

First stage of installation is to make the cut-out and fixing holes in the required position of the panel in accordance with the following:

Illustration 1.1: OPCPMK15
For AF-650 GP 230V to 5HP, 460/575V to 10 HP
For AF-600 FP 230V to 5HP, 460/575V to 10HP.

AF-650 GP/AF-600 FP Panel Through Mount Kit

2

1

Advertising