GE Industrial Solutions AF-600 FP Panel Through Mount Kit User Manual
Page 3
Advertising
1.3 Preparation
1.3.1 Preparing the Panel Cut-Out and Fixing Holes
First stage of installation is to make the cut-out and fixing holes in the required position of the panel in accordance with the following:
Illustration 1.1: OPCPMK15
For AF-650 GP 230V to 5HP, 460/575V to 10 HP
For AF-600 FP 230V to 5HP, 460/575V to 10HP.
AF-650 GP/AF-600 FP Panel Through Mount Kit
2
1
Advertising