Cluster Pad Assembly
Envelope 3, drawout, For 6000A UL / 5000A
ANSI

Cluster pad assemblies are supplied with the
Entelliguard breaker.

















































Cluster pad Assembly mounting Procedure:

1. Turn the breaker off and discharge the closing springs

by depressing the OFF and ON buttons in the
sequence OFF-ON-OFF. Verify that the breaker OFF-
ON indicator shows OFF on a green background and
that the charge indicator shows DISCHARGE on a
white background. If installing in a draw-out type
breaker remove breaker from adaptor (cassette)
before continuing


2. Assemble the Cluster pad assembly on the breaker

top & bottom rear terminals & orient them as shown
in Fig A.


3. Tighten the cluster pad assemblies on bottom & top

breaker terminals with torque of 80Nm (59 ft-lbs) as
shown in fig A.














Envelope Size Catalog #

Envelope 3

Cluster pad

GBB360TBD

EntelliGuard

®

G

Circuit Breaker

Accessories
Cluster pad Assembly

WARNING: Before installing any accessories, turn the
breaker OFF, disconnect it from all voltage sources,

and discharge the closing spings.

AVERTISSEMENT: Avant d’installer tout accessoire,
mettre le disjoncteur en position OFF, le déconnecter
de toute tension d’alimentation, et décharger les

resorts d’armement

DEH-41447 Installation Instructions

Fig B. Envelope 3 Cluster pad assembly, Side View

M12 Hardware
80 Nm Torque

M12 Spring
Washer

M12 Plain
Washer

Cluster Pad
assembly

Nut plate

M12 Hardware
80 Nm Torque

M12 Spring
Washer

M12 Plain
Washer

Cluster Pad
assembly

Nut plate


Fig A. Envelope 3, Cluster pad assembly
(Up to 6000A UL / 5000A ANSI)

Table 1. Cluster pad catalog numbers