GE Industrial Solutions EntelliGuard G Envelope 3, drawout, For 6000A UL _ 5000A ANSI User Manual

Page 2

Advertising
background image


Cluster pad support mounting procedure for
200kA:

Fig C. Envelope 3-200kA Cluster pad support assembly

4. Follow Step-1 to Step-3

5. Assemble Item B to Item A using Item C, Item D and

Item E hardware with Torque of 18-20Nm (13.3-14.8
Ft-lbs)



















Fig D. Envelope 3-200kA Cluster pad support assembly




GE Consumer & Industrial
Electrical Distribution

These instructions do not purport to cover all details or variations in equipment nor, to provide contingency to be met in connection
with installation, operation, or maintenance. Should further information be desired, or should particular problems arise which are not
covered sufficiently for the purchaser’s purposes, the matter should be referred to GE.

GE

41 Woodford Ave, Plainville, CT 06062
www.geelectrical.com

© 2009 General Electric Company

DEH-41447 R2 (07/01)

Advertising