Cluster pad support mounting procedure for
200kA:
Fig C. Envelope 3-200kA Cluster pad support assembly
4. Follow Step-1 to Step-3
5. Assemble Item B to Item A using Item C, Item D and
Item E hardware with Torque of 18-20Nm (13.3-14.8
Ft-lbs)
Fig D. Envelope 3-200kA Cluster pad support assembly